Problems Resolved In Xcp 2221; Problems Resolved In Xcp 2220 - Fujitsu M10 Product Notes

Hide thumbs Also See for M10:
Table of Contents

Advertisement

Table 3-9     Problems resolved in XCP 2230 (continued)
SPARC M10-
RTINo.
1
4
4S
RTIF2-
x
140910-
001

Problems resolved in XCP 2221

The following table lists the problems resolved in XCP 2221.
Table 3-10     Problems resolved in XCP 2221
SPARC M10-
RTI No.
1
4
4S
RTIF2-
x
x
x
140611-001
RTIF2-
x
x
140617-002

Problems resolved in XCP 2220

The following table lists the problems resolved in XCP 2220.
Fujitsu M10/SPARC M10 Systems Product Notes for XCP Version 2240 ・ March 2015
96
Description
If Oracle Solaris 11.2 and later is running
and the system board is deleted by
dynamic reconfiguration of physical
partitions, Hypervisor may abort.
Description
Security fixes. (CVE-2014-0224)
For details, see see the Oracle website
relating to the following:
Critical Patch Updates
In SPARC M10-4/M10-4S, power supply
interlocking by RCIL does not work.
Moreover, if the following RCIL-related
commands are executed, the "Controller
response timeout" error message is
output and the command ends
abnormally.
setremotepwrmgmt(8)
showremotepwrmgmt(8)
getremotepwrmgmt(8)
clearremotepwrmgmt(8)
Workaround
There is no effective workaround.
Workaround
Update the XCP firmware to XCP 2221 or
later.
There is no effective workaround.
Operate power supply of the target
SPARC M10 systems and I/O devices
manually.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sparc m10

Table of Contents