Removal Of The Electrical Box - Daikin E-Series Service Manual

Hide thumbs Also See for E-Series:
Table of Contents

Advertisement

SiENBE12-620
1.2

Removal of the Electrical Box

Procedure
Step
1. Disconnect the
connecting wires
1
Inside structure.
Disconnect the
2
connecting wires.
Removal Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Procedure
Electrical
box
Electronic expansion
valve coil
Liquid
pipe
Liquid stop valve
A port B port
Service
PCB
C port
Wiring fixfure
Services PCB
A port
B port
C port
Service port
Gas pipe
Gas stop valve
Power
supply
terminal
board
Earth
Earth
wires
Outdoor Unit
Points
Illustrations are for 3 room
model.
Connecting wires of the A, B,
C, D port
(1) - Black
Power supply
(2) - White
Power supply
(3) - Red
Transmission
Power Supply wires
(L) - Black
(N) - White
Fasten the wires on the
terminal board with screws.
269

Advertisement

Table of Contents
loading

Table of Contents