Side And Top Casing - Buderus Logano GE315 Installation And Maintenance Instructions Manual

Cast iron sectional boiler for oil or gaspressure jet burners
Table of Contents

Advertisement

Slide the front insulation (Fig. 34, [1]) with its slot
(Fig. 34, [2]) onto the front edge of the upper support
bracket.
Lead the burner cable (Fig. 34, [3]) on top of the
thermal insulation down over the side of the boiler
block.
With two screws secure the burner cable and strain
relief on the lower cross tie-rod (Fig. 34, [4]).
NOTE!
To prevent the cable being damaged when
opening the burner door, always route the
burner cable – depending on the handing
of the burner door – on the hinge side of
the door.

2.7.3 Side and top casing

Hook the side casing (Fig. 35, [1]) with cut outs into
the slots of the upper cross support bracket (Fig. 35,
[2]) and push forward against the end stop (see arrow
in Fig. 35).
With two self-tapping screws each secure the side
walls at the bottom (Fig. 35, [3]).
Logano GE315 - We reserve the right to make any changes due to technical modifications
2
1
Fig. 34 Installation of the front insulation
2
1
Fig. 35 Side casing installation
Installation
2
3
4
3
27

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents