Buderus Logano GE315 Installation And Maintenance Instructions Manual page 15

Cast iron sectional boiler for oil or gaspressure jet burners
Table of Contents

Advertisement

Set both ratchet spanners onto the clamping nuts of
the compression unit and press the boiler sections
evenly together by tightening the nuts equally.
ATTENTION!
Do not continue to tighten the assembly by
force once the hubs are in contact. Further
tightening could damage the boiler
sections.
Loosen and remove boiler compression tool.
Check nipple for correct seating.
ATTENTION!
Loosening the boiler compression tool size
2.3 can lead to a slackening of the pull rod
screw connections (
Therefore check and, if necessary, re-
tighten the boiler compression tool before
its next use (
Carrying out the compression step with
loose screw connections can lead to
damage or the destruction of the
compression tool.
Align the boiler section to ease assembly.
Assemble all other boiler sections as described.
The front section is assembled last.
Logano GE315 - We reserve the right to make any changes due to technical modifications
Fig. 16, [1]).
Fig. 16, [2]).
1
Fig. 16 Boiler compression tool size 2.3
Installation
2
2
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents