Flange Mounting Instructions

Notes:
• The integral process seal MUST rest on the customer-supplied flange (see the
detail below).
• The straight/taper transition of the rod should extend past the nozzle/vessel
opening. Add extensions as required
1)
wiring access
cover
process
device tag
vessel
minimum diameter
2" / DIN 50
customer-supplied flange
Rod Extension Requirements
* Refer to the
1)
Rod Extension Requirements
Refer to the
7ML19985JP02
1/2" NPT
or M20 x 1.5
cable entry
integral process seal
nozzle/vessel juncture
straight/taper transition
SITRANS LR200 (HART) – INSTRUCTION MANUAL
1)
.
locking ring
customer-flanged
nozzle to suit
table on page 164.
table on page 164
Page 163