Outdoor Unit: RXS09/12LVJU
4.3
Removal of PCBs
Procedure
Step
1. Remove the main PCB
and the forced operation
button PCB.
1
Layout of the main PCB
2
Remove the screw on
the terminal board.
273
Warning
Be sure to wait for 10 minutes or more after turning off all power supplies
before disassembling work.
Procedure
Main PCB
You can remove the main PCB
when you disconnect the lead
wires on the terminal board
without removing the electrical
box.
Forced operation
button PCB
(R16997)
Terminal
board
(R11854)
SiUS091133
Points
Removal Procedure