Tiller Arm/Shift Lever Installation - Mercury 40 Service Manual

Hide thumbs Also See for 40:
Table of Contents

Advertisement

Tiller Arm/Shift Lever
Installation
1. Install shift lever with detent assembly to bracket.
d
d
a
a - Bolt
b - Tab Washer
c - Washer
d - Wave Washer (2)
e - Shift Lever
f - Bushing
g - Detent Assembly
2. Install tiller handle with bushings to bracket. Se-
cure in place with washers and bolt with nut.
Tighten bolt, allowing tiller handle movement.
Torque nut to 40 lb. ft. (54 N·m).
c
b
a
a - Tiller Handle
b - Bushings (2)
c - Stainless Steel Bushing
d - Washers (2)
e - Bolt
90-852572R1 JANUARY 1998
g
f
e
c
b
55337
d
e
51606
3. Reinstall plug.
a - Plug
4. Connect stop switch wire at bullet connector and
secure ground wire to handle with screw.
a
a - Stop Switch Wire (Bullet Connector)
ATTACHMENTS/CONTROL LINKAGE - 7B-17
55338
55339

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

505560

Table of Contents