Mercury 40 Service Manual page 529

Hide thumbs Also See for 40:
Table of Contents

Advertisement

9. Retract throttle cable into gear assembly until ap-
proximately 17 in. (43 cm) extends from the tiller
arm.
a - Cable [Extends 17 in. (43 cm)]
10. Slide stainless steel conduit over throttle cable
and thread into tiller arm until lightly seated. Ro-
tate conduit counterclockwise one full turn from
a lightly seated position.
a - Stainless Steel Conduit
90-852572R1 JANUARY 1998
11. Slide brass barrel over throttle cable tube. Se-
a
51604
a - Brass Barrel
b - Tube
c - Allen Screw
d - Tiller Handle
12. Install throttle cable guide onto throttle cable. Se-
a
a - Cable Guide
51604
b - Screws (2)
c - Hole (Faces Up)
cure barrel to tube with allen screw approximate-
ly 3.5 in. (89 mm) from stainless conduit. DO NOT
OVERTIGHTEN screw, as tubing may be
crushed, binding throttle cable. Position barrel to
face towards tiller handle.
b
c
a
cure guide to cable with anchor and two screws.
Guide hole should face up.
a
b
c
ATTACHMENTS/CONTROL LINKAGE - 7B-15
d
51607
51602

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

505560

Table of Contents