5. Assembly HSG ILL Module
5.1 FM1 Assembly
I. FM1 must be placed on datum surfaces well and breach of FM1 must be face to inside( Fig
5-1)。
II. Insert the" CLIP of FM1" into the hole on the HSG ILL and make sure " CLIP of FM1" hook
on the HSG ILL well ( Fig 5-2)。
5.2 CM Assembly
III. Assemble CM to HSG ILL and to make CM contact three datums on the HSG ILL well( Fig
5-3)。
IV. Assemble "CLIP of CM" to the HSG ILL ( Fig 5-4) 。
93