B4. Test Sequence
Atmospherics, Dynamic, and Regulatory test sets require separate units and can be processed in
parallel. EUT testing shall be performed serially within each set.
1
Package Vibration
2
Package Drop
3
Un-Package Vibration
4
Un-Package Shock
5
Bench Drop
Set 1 (2 units)
Dynamics:
Set 2 (2 units)
Atmospherics:
Temperature / Humidity,
Operating
Storage High Temperature /
Humidity, Non-operating
Altitude, Operating
Start
25
Set 3
Safety/EMC:
EMC
ESD
Surge
Safety