8.7
Test Case Result Reporting
Table 4.
Result
Pass (P)
Fail (F)
N/A
N/S
N/T
Blocked (B)
.
9 Test Cases
This section details the tests that will be performed during the testing period. Partner is responsible for
identifying any features or functions not supported covered in the test cases prior to start of testing
9.1
Endpoint IVT Workflow & Test Case Mapping
Test Work Flow Sections
Endpoint Registration & Validation (Step 1 & 2)
Functional Tests (Step 3)
Negative Tests (Step 4)
Miscellaneous Tests (Step 5)
© 2014 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public.
Test Results Legend
Description
The test case passed with no exceptions
The test case failed – details of the failure are noted in the Comments column
The test case is not applicable to the product under test. Provide justification in the "Comments" column.
Not supported. While the feature tested by this test case generally would be considered a standard feature
for this product category, this specific product (or this specific release) does not support the feature.
Not tested. The feature is supported by the product under test, but external factors (lab configuration, e.g.)
prevented execution of the test. Justification must be provided in the Comments column.
Other test case failures prevented the execution of this test. Reference the failed test case in the"Comments"
column.
Test Case #
Total Tests
EP-1
EP-2 EP-45
EP-46 EP-50
EP-51 EP-56
A/M
1
M
44
M
5
M
6
M
Page 13 of 64