O-E41/O-E42/O-E43/E48/O-E49, Etc - Pentax 67 II Service Manual

Hide thumbs Also See for 67 II:
Table of Contents

Advertisement

8.2 0-FAI
(Curtain
pipe), O-E42 (1st curtain
pipe),
O-E43 (2nd curtain pipe),
E48
(Isl
curtain
shaft
A), O-E49
(1st
curtain shan B), etc.
1) Remove
any
oil from ribbon
atlachment section
of
O-E43.
2)
Peel
off
hacking paper
E54 on O-E59 aud attach
ribbons with low place
on
drnrn ramp
section of O-E43 as standard.
3)
Rotate
O-E43,
wiud
off
ribbou,
and se.al.
4)
Provisionally attach
E48 and O-E49
to
0-£15
and remove
any oil
from
E48
atlachment
section and
O-E49 attachment section.
5)
Peel off backing paper
E.54 on O-E63 side
and attach ribbons with low place on drum ramp
section
of
O-E49
as standard.
6)
Rotate
O-E35,
wind off ribbon, and
seal.
7)
Remove
any
protrnding
adhesive, etc., and
leave undisturbed
for
more than 12 hours.
8)
Remove
any
oil from O-E41 ribbon
attachment
section.
9) Remove peeling paper E.53 on O-E59
side
and attach shutter with a low place on drnm ramp section of O-E41
as standard.
10) Rotate O-E41, wind
shutter
and seal.
11) Remove peeling paper E53
on
O-E63 side and
attach
shutter in principle with low place on ramp section
of
O-E42 as standard.
12) Rotate
O-E42,
wind off ribbon, and seal.
13) Remove any protrnding adhesive,
etc.,
and leave undisturbed for more than 12 hours.
27340
57170

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents