O-D1 Operational Check - Pentax 67 II Service Manual

Hide thumbs Also See for 67 II:
Table of Contents

Advertisement

7.5 0-Dl
(Mirror
base
plate
assy.) operational check
l)
048,
D50
vertical loosrncss
----------
max.
0.05
2)
D48,
D 17
latching
---
------------------
max.
1/2
of plate thickness of D48
3)
Mirror restoration lever operation
--
Should
operate.
smoothly.
4) Position of 0-040 gear--------------- Slightly wiud 0-043 anticlockwise, looseu
catch, slowly
return
O-D43,
hereupon
catching should
occur.
5)
Wiudiug of 0-043
--------------------There
should be no winding stiffness or hang-up.
ff the stopper is removed,
readjust
0
-D40.
6) Position of D24 book----------------- Should not
come
into
contact
with
043
during
winding.
7)
Position of
Dl 7
hook----------------
Check
in black marker pen position and spiral
spring stop
position
after
winding.
8)
Position of D26 book
---------------- Check
in black marker pen position
and
spiral spring stop position after winding.
9) D50 gap -------------------------------- 0.6
-
0.9 mm
Reset
(
M_
restore lever }-
7_
6.
8_
4_
27340
9.
re-set
(Brake)
G.S/70

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents