The Balmoral ® Front Installation - FPI P36D-NG1 Owners & Installation Manual

Direct vent gas fireplace
Hide thumbs Also See for P36D-NG1:
Table of Contents

Advertisement

1) Bend tabs located at the back of the Balmoral Front upwards 90
degrees.
Backside of Front shown.
2) Secure the bottom frame of the Front by loosening the inner screw
on the hinge brackets on both the left and right side of the fi rebox.
Slide frame in place and secure.
Hinge bracket on
bottom of fi rebox
Balmoral Front
frame
3) Slide tabs into louver brackets located on the inside top of the
fi rebox.
FPI P36D-1 Zero Clearance Direct Vent Gas Fireplace
THE BALMORAL
B e n d
t a b
upwards 90
degrees.
Left Side Shown
Tabs
Bracket inside
top of fi rebox.
PALACE™ SERIES OPTIONS
®
FRONT INSTALLATION
4) Remove existing control switch box from under fi rebox by disconnecting
wires connected to the valve at TH-TH/TP terminals and discard.
Control Box
5) Connect the ON/OFF switch wires coming from the left side of the
Front to the valve, with black hooked up to the TH/TP terminal and
red hooked up to the TH terminal.
NOTE: If fan option is not used please see step (5) of optional fan
installation for placement of fan control box.
Fan Control Box
6) For optional fan installation, see "Optional Fan Installation" section.
7) For 2-panel & 3-panel door installation, see "2-Panel Door Installation
& 3-Panel Door Installation" sections.
Wires connected to Valve.
Valve
ON/OFF Switch
Wires
63

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

P36d-lp1

Table of Contents