INSTALLATION
The shaded area in the diagram shows all allowable combinations of straight vertical and offset to vertical terminations, using two 90
rigid pipe vent systems for Propane and Natural Gas.
•
Vent must be supported at offsets.
•
Firestops are required at each fl oor level and whenever passing through a wall.
•
Maintain clearances to combustibles.
Note: Must use optional rigid pipe adaptor when using rigid vent systems (Part # 510-994).
26
VENTING ARRANGEMENTS
VERTICAL TERMINATION
RIGID PIPE SYSTEM
(Propane & Natural Gas)
FPI P36D-1 Zero Clearance Direct Vent Gas Fireplace
o
elbow, with