Plumbing Manifold - Worcester Greenstar 12i System Instruction Manual

Wall hung rsf gas fired condensing boiler
Hide thumbs Also See for Greenstar 12i System:
Table of Contents

Advertisement

Flow22mm
( )
Gas
Supply (alternative
from above appliance)
22mm
PLUMBING MANIFOLD
'
l
: :
'
'
'
'
'
'
'
'
'
'
'
'
'
'
'
'
'
:
'
'
'
' '
' '
'
'
' '
'-·'
Aow22mm
l
ill&
Mains Ga&
Supply
22mm
PlUMBING MAN IFOLD
'
'
'
'
'
'
'
,
__
,
Retum 22mm
A
CONNECTIONS:
Heeting
System:
22mm compression fitti:ngs
Gas:
22mm
compression
fittings
Use
the
fittings
suppl
~
in the
lit/Hardware
paclt.
H
the
boiler
pipes
are
to
be
run behind the
applianoe
ensure
that the pipes
pass
through
the
$lol in
the yellow plastic guide
(A).
Thi.s is
frtted
to
the
boiler
frame.
Further guidance on pipe routing can be
found
printed on the
boi ler
template
(supplied
wHh the
boiler).
IMPORTANT:
IF
RTTING
OPTIONAL
INTEGRAL DIVERTER VALVE
D
i
sregard this page and
refer
to the
correct version
for
installing the
integral
d
lver
ter valve In
the
ADDITIONAL
INFORMATION sec:lion
at
the
back
o
f
this
book.
1N5W..!JllON
& SERVICING
lhSfRUCfiC.NS
FOR
WORe~
GReENSfAA 121
S,l~i
SpkM
811G
11201!56l~
rwoRCESTER

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greenstar 24i system

Table of Contents