Worcester Greenstar 12i System Instruction Manual page 63

Wall hung rsf gas fired condensing boiler
Hide thumbs Also See for Greenstar 12i System:
Table of Contents

Advertisement

2
3
,
/
c
I
'
I
I
I
I
'
'
A
E
'•
,
........
...
...
'
..
_____
. .
1
4
4
.1
---~·
· ·
-
...
-~
~
"",,
...
...
.......
.. __ T
__
..
_ .. .a.
..
_
...
.-
'
,_
\
'
,
~ORCESTER
!H$T"/UP10N
6 SEIMONG lkSTRVCTlONS FOR WORCESTER
GAttNSTNI
Ill
S,~
~tell
8716112055a(04105}
Bosch
GtcKip
BOILER CONNECTIONS
ASSEMBLY OF
THE
INTERNAL
HOT WATER
RETURN
PIPE
TO
THE BOILER
Using the boiler
packagi
ng as protection
t urn the boiler on
Us l
eft hand
si de
to
facilitate assembly of the hot water return
pipe.
1.
Move the control panel into the service
position by
removing
the
screw (A) from the
retaining
bracket.
2. Loooon
the two
mlaining &Crews (8)
to
frea
1he
back
clamp;ng plate on the hydowlic
block
(C) shown ;, 3.
3. Remove the
brass
bung assembly (0) from
1he hychulic
block
by removing
the screw and
sliding ;t free
hom
the flange on 1he clamping
plate
(C). Make
sure
that the
other
brass
bung assembly (E)
;s
tetained
;n
place.
• 4.
Remove the"""""'
p;pe
(F) ftom the
Opt;onollntegml
DWenet Val\e Kft
and
feed the
flat
end
of the
pipe
through
the
,...,
of
1he b<ilet
as shown. BeiOI'e
flting
the pipe, check
that
the
seal
is
in position on
the plastic
moUding.
Side
1he flat end
of
the
p;pe (G) undet the flange (H)
on
the
hydraulic bloc* damping plate
(C)
making sure
that
it
is
located c:orrecdy.
• Re·tighten
the
d~
plate
by
re•tightening
1he two screws
(B)
as shown
;n
fog:
2.
4.1 On
completion
the
pipe
MScmbly
should
look
as shown.
BOILER CONNECTIONS

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greenstar 24i system

Table of Contents