Worcester Greenstar 12i System Instruction Manual page 37

Wall hung rsf gas fired condensing boiler
Hide thumbs Also See for Greenstar 12i System:
Table of Contents

Advertisement

~ORCESTER
Bosch
GtcMip
c
I
I
'
'
2.1
'
'
'•,
'
•,
·-
..
~
·
---------------·
IHGT/UMION 6 SEIMONG INSTRVCTlONS FOR WORCESTER
GAttNS"t.vl 121
S,~
St1tcfl
871611205!ia(04105)
1.2
'
I
'
INSPECTION AND
S ERVIC
E
Component Access
1.
Removl
ng outer case
1.
Remove
bottom
panel
by pvn;ng
rt
forward
aod
off.
1.1
UOOo
and femcwe
2
scfews
(A)
secu(lng
boiler
casing
at
the
top
of
the appliance.
1.2
Undo
but
do
not
remove the
2
screws
(B) sec:uring
boiler
casing at
the
bottom
of
the
appliance.
1.3
Pull
case
forward and
remove.
2.
Adjusting boiler control to
service position
2.1
Remove
screw
(C) securing
control.
2.2
Gently pull forward until
it
comes
to
rest
in service position.
Primary
Heat
Exdlanger
There
is a
spedal
accassory
kit
available
specifically
designed
for
cleaning
the
heat
exchanger.
lf required order
7 716 1 92 312.
3
Check
fan
Pfessure
at
the
test point
next
to
the
tan
using an
electronic
manometer.
,.
The boiler
must
be run
at
maximum
output
Pressure
will
read
negative and
be
greater
than:
Natural
gas
LPG
1
2i
System-
3.1
ml>ar
1 2i
System
-
4.9
mbar
241
System
-
3.1
mbat
241
System - 4.1
mbar
Pressures
measuted
below these figures
will
indicate
that
the
heat
exchanger
will
require
c~ani
ng.
INSPECTION
AND
SERVICE

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greenstar 24i system

Table of Contents