Worcester Greenstar 12i System Instruction Manual page 24

Wall hung rsf gas fired condensing boiler
Hide thumbs Also See for Greenstar 12i System:
Table of Contents

Advertisement

Edge
of
case
t
Turret
I
i-j
,.,._
_ _
200mm- - - .
E:]
t
Clamp
L
-1
~
.
FLUE
INSTALLATION
189mm
t
Ave
FLUE
INSTAUAT10N
HORIZOr-ITAL
FLUE
(60/tOOmm
diame1er)
For verocal Rues and 80112Smm horizontal flues,
please
ref(t(
to
separate
instructions supplied
with
the
flue
kit
NOTE:
to ease
the
assembly
of
Hue components,
8pply
silicone lublicont
to
.,.ling
sutfaces.
The
instruction$
fOf
the
601/00mm di8meter flue
we
shown bek.:11v.
MEASURING
THE
FLUE
(Standard Flue):
~
M<.asuro
from
tho outside wall
to
the <:entre
tine o
f
the flue
turret.
Subtract 93mm
from the length
l
to
give
the
correct
dimens'on
to the flue elbow
connection.
The terminal
section
should be
cut
to
th~-s
dimension, however
it
must
not
be cut
shorter
than
250mm.
After
euHing,
the
end must
be
square and
free
from
buus to
prevant damage
to
the
flue
seals.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greenstar 24i system

Table of Contents