Worcester Greenstar 12i System Instruction Manual page 62

Wall hung rsf gas fired condensing boiler
Hide thumbs Also See for Greenstar 12i System:
Table of Contents

Advertisement

PLUMBING
MANIFOLD
CONNECTIONS:
Flow
22mm
{j
Gas Supply (alternative from
above appliance)
22mm
Heeting
System:
22mm compression
fitti:ngs
Gas:
22mm
compression
fittings
Cylinder
Return
15mm compression fittings
B
Supply
22mm
PlUMBING
MANIFOLD
Cyfinder
Retum
15mm
ill
ill
l !
urn
22mm
Cylinder
Return
15mm
C
H
Return
22mm
c
A
Use
the
fittings
supplied
in
the
lit/Hardware
pack and
the
OptionaJ
Diverter Va.tve
Kit.
Before the wall
mounting frame
is
fitted
to the
wall
you
must fust
assemble
tho
s~Mvice
valve
(A) included in
the
Optional
Oiverter Valve
K~
and &ecure
to
tha
wall
mounting frame
as
shown
with
the
two
screws
(8)
supplied.
If
the
boiler
pipes are
to
be
run
behind
the
applianoe
ensure that the pipes pass through
the
slot
in
the yellow plastic
guide
(C).
This is
fitted
to
the
boiler
frame.
NOTE:
If
the
optional
diverter
valve
is used
with
an
unvented
cylinder
then
a zone valve
must be
fitted
in
the
How
or return
to
the
cylinder
to
comply
with
unvented
cyfinder
regulations.
Further guidance
on pipe routing
ca.n be
found printed
on
the
boiler
templa
te
(supplied with the
boiler).
NOW RETURN TO THE MAIN
INSTRUCTIONS PAGE 16 TO
CONTINUE
INSTALLATION.
INsw.tNION & SERVICING INSfRUCTKNS FOR
\'lORe~
GR£ENSfAA 121
S,~b'W'24i
SpkM
8716
112Cie.~{~

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greenstar 24i system

Table of Contents