Bathrooms; Plumbing Manifold; Connections - Worcester GREENSTAR 24i Junior Installation, Commissioning And Servicing Instructions

Hide thumbs Also See for GREENSTAR 24i Junior:
Table of Contents

Advertisement

If Side Clearances are Reduced (millimetres)
If total side clearance is
Increase height
reduced to:
clearances to (approx):
(Combined left & right
(Combined top &
clearances excluding
bottom clearances
appliance)
excluding appliance)
350
441
300
523
250
617
200
717
150
856
100
1012
50
1202
Table 10 Reduced side clearances
If Front Clearance is Reduced (millimetres)
If front clearance
Increase overall height
(to removable
clearances to (approx):
door) is reduced
(Combined top and
to:
bottom clearances
excluding the appliance)
50
511
25
596
Table 11 Reduced front clearances

3.6.6 BATHROOMS

A boiler fitted with a mechanical timer or RF mechanical timer (receiver)
or FW100 controller may only be installed outside the shaded area.
A boiler with any other timer fitted (or blanking panel for an optional
programmer) can be installed in zone 2.
Additional RCD (Residual Current Device) protection may be required.
Refer to the latest IEE wiring regulations.
2* Without the end wall, zone 2 must extend 600mm from the bath
Radius 600mm
Fig. 16 Bathroom installations
6 720 802 047 (2013/05)
or Front clearance
(to removable
door) must be
increased to:
129
161
200
243
295
358
434
or Increase total side
clearance to:
(Combined left & right
clearances excluding
the appliance)
505
569
6720646608-124.3Wo
3.7

PLUMBING MANIFOLD

3.7.1 CONNECTIONS

Heating System
22mm compression fittings
DHW
15mm compression fittings
Gas
22mm compression fitting
Use the fittings supplied in the Hardware literature pack.
• If the boiler pipes are to be run behind the appliance ensure that the
pipes pass through the slot in the white cardboard guide. This is fitted
to the boiler frame.
Further guidance on pipe routing can be found printed
on the boiler template (supplied with the boiler).
• For further ease of fitting, an optional Vertical Pre-piping Assembly kit
is available, comprising five
pre-formed copper pipes and an earth bonding strip.
Part number: 7 716 192 570.
• To cover the pipe work under the boiler, down to the counter top, an
optional "Below boiler pipe cover" can be used.
Part number: 7 716 192 608
6
1
2
Fig. 17 Pipe dimensions
PRE-INSTALLATION
3
4
5
7
15