D
5
6
::n.,ORCESTER
8osdl
GtCKJp
c
22nwn
c
IHGftu.riflON 6
SEIMONG
INSIRUCTlONS FOR WORCESTER GRttNStNI Ill S,'Wlfl'li2ofl
Stllcll
8716 112055a(04105)
BOILER CONNECTIONS
CA!Jli(H-,
:
l:"iCLA.'!-
If-
!-
!·.~AI\~)
(;
,
4 .~)
S,,;-::-:Jy :'l.,fFCf<F
:-;~:..;~~INC~
All
Y
'
• /•:em-<
;\~
..
:)
03Sf=
<('•,'::C
;\
.
l
'(:=-lE'·JI'.~
..
T
SA.F::'"T''
I'R[CI\UTO\;S
GAS AND WATER CONNECTIONS:
A·
Aow (22mm),
B ·Return
(22mm),
C
·
Gas
inlet
(22mm).
•
5.
Lower
the
control
panel
into the
setvice
position
by
removing
the screw
(0)
from the
retaining
bracket.
•
6
.
Make
connections to
the
heating
system.
,.
Connect
the
gas supply
to
the
boiler gas
cock
22mm
oompmssion.
•
7.
Connect
the
expansion
vessel flexible
pipe
to
the hydraulic
manifofd
situated
left
o
f
the
pump
.
lt is
necessary to remove and
di:&card
the
orange
plastioc
blanking
plug
(E)
from
the
connection
at
the
hydraulic
m.:mifold
befOre
&ecuriog
the
expansion
vessel
flexible
pipe
(f) in
place
with
the
wire
retaining
clip (G
).
•
8.
Connect
the
pressure
relief
drain pipe
to
t5mm compression joint
(H)
using
the
nut
and
olive supplied
in
the
hardwate literature
pack.
BOILER
CONN
ECTIONS