Daikin RZQ100B8V3B Service Manual page 105

Hide thumbs Also See for RZQ100B8V3B:
Table of Contents

Advertisement

ESIE05-03
Defrost ending
The defrost cycle will be ended when one of the following conditions have been reached :
conditions RZQ71
OR
Defrost ending
The defrost cycle will be ended when one of the following conditions have been reached :
conditions
RZQ100~140
OR
Part 2 – Functional Description
1 minute has elapsed since start of defrost operation
&
Outdoor unit heat exchanger temperature ≥ 10°C
10 seconds have elapsed since start of defrost operation
&
High Pressure ≥ 24,5bar (calculated from LP, inv frequency and PI)
10 minutes have elapsed since start of defrost operation
1 minute has elapsed since start of defrost operation
&
Outdoor unit heat exchanger temperature ≥ 10°C
10 seconds have elapsed since start of defrost operation
&
High Pressure ≥ 24,5bar (calculated from indoor unit heat exchanger temperature,
inv frequency and PI)
7 minutes have elapsed since start of defrost operation
&
Outdoor unit heat exchanger temperature ≥ 6°C
8 minutes have elapsed since start of defrost operation.
General Functionality
2
2–21
1
3
4
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rzq71b8v3bRzq125b7w1bRzq125b8v3bRzq140b7w1bRzq100b7w1b

Table of Contents