Mantel And Wall Projections - Heat & Glo SL-550TR-E Installation Manual

Hide thumbs Also See for SL-550TR-E:
Table of Contents

Advertisement

B. Mantel and Wall Projections
WARNING! Risk of Fire! Comply with all minimum clear-
ances as specifi ed. Framing closer than the minimums list-
ed must be constructed entirely of non-combustible materi-
als (i.e., steel studs, concrete board, etc.).
Note: Measurement is taken from top of the
opening, NOT the top of the fi replace.
7
6
5
4
3
4
MEASUREMENTS FROM
TOP EDGE OF THE OPENING
See Dimension V on Appliance Dimension Diagram
Figure 3.1 (550/750)
Figure 3.2 (950).
Figure 10.3 Clearances to Mantels or other Combustibles
above Appliance
3-1/2 in.
1/2 in.
NON-COMBUSTIBLE ZONE
Figure 10.4 Non-Combustible Zone
Models: SL-550TR-E, SL-750TR-E
SL-550TR-IPI-E, SL-750TR-IPI-E
Heat & Glo • SL-550/750TR-E, SL-550/750/950TR-IPI-E Installation Manual • 2118-910 Rev. C • 4/16
52
CEILING
12
11
10
9
8
32
13
12
11
10
9
8
7
6
5
1/2 in. SHEETROCK
OR COMBUSTIBLE
MATERIAL
Combustible Mantel Legs or Wall Projections
Note: Clearance from opening
to perpendicular wall.
FIREPLACE OPENING
See Dimension B on Appliance Dimension Diagram
Figure 3.1(550/750)
Figure 3.2 (950)
Figure 10.5 Non-Combustible Mantel Leg or Wall Projections
(Acceptable on both sides of opening)
Note: Clearance from opening
to perpendicular wall.
FIREPLACE OPENING
See Dimension B on Appliance Dimension Diagram
Figure 3.1(550/750)
Figure 3.2 (950)
Figure 10.6 Combustible Mantel Leg or Wall Projections
(Acceptable on both sides of opening)
3-1/2 in.
1/2 in.
Figure 10.7 Non-Combustible Zone
Models: SL-950TR-IPI-E
1/2 IN.
MINIMUM
2-7/8 IN.
MINIMUM
3 FT. MAXIMUM
3 IN.
MINIMUM
5-3/8 IN.
MINIMUM
UNLIMITED
1/2 in.
SHEETROCK
NON-COMBUSTIBLE
BOARD SHIPPED
WITH APPLIANCE

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents