Mantel And Wall Projections - Heat & Glo SL-5F Installation Manual

Hide thumbs Also See for SL-5F:
Table of Contents

Advertisement

B. Mantel and Wall Projections
WARNING! Risk of Fire! Comply with all minimum clear-
ances as specified. Framing closer than the minimums listed
must be constructed entirely of non-combustible materials
(i.e., steel studs, concrete board, etc.).
Note: All
measurements
in inches.
3
Figure 10.3 Clearances To Combustible Mantels Or Other
Combustibles Above Appliance
Combustible Mantel Leg or Wall Projections
TOP VIEW
FIREPLACE OPENING
See Dimension B on Appliance
Dimension Diagram (Figure 3.1).
Figure 10.4 Combustible Mantel Leg or Wall Projection
(Acceptable on both sides of opening)
FIREPLACE OPENING
See Dimension B on Appliance
Dimension Diagram (Figure 3.1).
Figure 10.5 Combustible Mantel Leg or Wall Projections
(Acceptable on one side of opening)
48
CEILING
12
11
10
9
8
7
32
6
5
13
4
12
11
10
9
8
7
6
5
4
TOP OF HOOD OR FIREPLACE OPENING
Note: Clearance from opening
to perpendicular wall.
1/2 IN.
MINIMUM
2-7/8 IN.
MINIMUM
3 FT. MAXIMUM
Note: Clearance from
opening to perpendicular wall.
3 IN.
MINIMUM
5-7/8 IN.
MINIMUM
UNLIMITED
Heat & Glo • SL-5F, SL-7F Installation Manual • 2499-980 Rev. L • 10/19
Non-Combustible Mantel Leg or Wall Projection
TOP VIEW
FIREPLACE OPENING
See Dimension B on
Appliance Dimension
Diagram (Figure 3.1).
Figure 10.6 Non-Combustible Mantel Leg or Wall Projections
(Acceptable on both sides of opening)
3-1/2 in.
1/2 in.
NON-COMBUSTIBLE ZONE
Figure 10.7 Non-Combustible Zone
Note: Clearance from opening
to perpendicular wall.
6 IN. MAX.
UNLIMITED
3 IN. MIN.
1/2 in. SHEETROCK
OR COMBUSTIBLE
MATERIAL

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sl-7f

Table of Contents