D. Mantel and Wall Projections
WARNING! Risk of Fire! Comply with all minimum clear-
ances as specifi ed. Framing or fi nishing material closer than
the minimums listed must be constructed entirely of noncom-
bustible materials (i.e., steel studs, concrete board, etc).
Combustible Mantels
6
5
4
3
2-1/2
10
5
TOP EDGE OF THE OPENING
Note: All measurements in inches.
Note: Measurement is taken from top of the
opening, NOT the top of the fi replace.
Figure 5.3 Minimum Vertical and Maximum Horizontal
Dimensions of Combustibles
TO CEILING
18
12
11
10
32
9
8
25
7
19
18
17
16
15
14
13
12
11
MEASUREMENTS FROM
Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09
Combustible Mantel Legs or Wall Projections
TOP VIEW
A
FIREPLACE OPENING
MANTEL LEG OR WALL PROJECTIONS
A
If
minimum is ____, then
2-7/16 3-7/16 4-7/16 5-7/16 6-7/16 7-7/16
Inches
A
62
87
Millimeters
1
2
Inches
B
25
51
Millimeters
Figure 5.4 Clearances to Mantel Legs or Wall Projections
(Acceptable on both sides of opening.)
INTERIOR WALL
B
B
maximum is_____.
113
138
164
189
∞
3
4
5
∞
76
102
127
21