D. Mantel and Wall Projections
WARNING! Risk of Fire! Comply with all minimum clear-
ances as specifi ed. Framing or fi nishing material closer than
the minimums listed must be constructed entirely of noncom-
bustible materials (i.e., steel studs, concrete board, etc).
All measurements are in inches.
7
6
5
4
3
4
TOP OF HOOD OR FIREPLACE OPENING
Figure 5.3 Clearances to Mantels or other Combustibles
above Appliance
3-1/2 in.
1/2 in.
NON-COMBUSTIBLE ZONE
Figure 5.4 Non-Combustible Zone
CEILING
12
11
10
9
8
32
13
12
11
10
9
8
7
6
5
1/2 in. SHEETROCK
OR COMBUSTIBLE
MATERIAL
Heat & Glo • SLF-550TR-IPI-E • 2118-901 Rev. B • 7/12
2-7/8 IN.
MINIMUM
Note: Clearance from opening
to perpendicular wall.
Figure 5.5 Mantel Leg (Acceptable on both sides of opening.)
5-3/8 IN.
MINIMUM
Note: Clearance from opening
to perpendicular wall.
Figure 5.6 Wall Projection (Acceptable on one side of opening.)
1/2 IN.
MINIMUM
3 FT. MAXIMUM
3 IN.
MINIMUM
UNLIMITED