Dismantling The External Panels - Biasi Inovia 25S ERP User Manual And Installation Instructions

Wall hung, fanflue, roomsealed, high efficiency gas boiler
Hide thumbs Also See for Inovia 25S ERP:
Table of Contents

Advertisement

Fig. 9.4
• By pressing key 12 (Fig. 9.1) confirmation
of the inserted value is obtained.
• Press keys 15 or 16 to exit without chang-
ing the value.
• Exiting the "programming mode" is au-
tomatic, after 15 minutes, or by cutting
power.
After maintenance, if the value is left on 0
the maintenance symbols will not disappear
but instead continue to flash, as they did
prior to maintenance.
The remaining months until maintenance
will be replicated in read only in the 'info'
section under value J15.
N.B.: the flashing symbol in Fig. 9.5 is not
an error. The boiler continues to run nor-
mally but it indicates the expiry of the main-
tenance period.
Fig. 9.5
9.3
Dismantling the external
panels
Front panel
• Unscrew screws A and remove the front
- 70 -
MAINTENANCE
panel D by pulling it and pushing it to-
wards the top so that it is freed from the
top housings (Fig. 9.6).
Side panels
Loosen screws "B - F" and "C - H" in Fig. 9.6
and remove the two side panels E and G by
pulling towards the outside.
B
F
G
Fig. 9.6
A
C
E
H
D

Advertisement

Table of Contents
loading

Table of Contents