INSTALLATION
supply.
In this case, when the boiler is switched off
some important features like the antifreeze
system, the monitoring of the boiler by the
operation lights, the post circulation of the
pump, etc. are completely deactivated.
For these reasons it is advisable to use the
first diagram (Fig. 6.30).
- 48 -