Sign In
Upload
Manuals
Brands
Intel Manuals
Chassis
SC5275-E BRP
Intel SC5275-E BRP Manuals
Manuals and User Guides for Intel SC5275-E BRP. We have
1
Intel SC5275-E BRP manual available for free PDF download: Install Manual
Intel SC5275-E BRP Install Manual (34 pages)
Local Control Panel Kit for Entry Server Chassis
Brand:
Intel
| Category:
Chassis
| Size: 1 MB
Table of Contents
Safety Information
3
Important Safety Instructions
3
Wichtige Sicherheitshinweise
3
Consignes de Sécurité
3
Instrucciones de Seguridad Importantes
3
Table of Contents
5
Local Control Panel Kit Installation Instructions
9
Before You Begin
9
Kit Content List
9
Tools and Supplies Needed
10
System References
10
Installation Instructions for Intel® Server Chassis SC5300/SC5400
10
Remove Access Cover
10
Figure 1. Removing Access Cover
10
Remove Bezel Assembly
11
Figure 2. Removing Bezel Assembly
11
Remove Outer Bezel Door from Bezel Assembly
12
Figure 3. Removing Outer Bezel Door from Bezel Assembly
12
Remove Upper Third of Bezel Grill
13
Install LCP Grill
13
Figure 4. Removing Upper One-Third of Bezel Grill
13
Figure 5. Installing LCP Grill
13
Remove Lowest CD-ROM/DVD Drive Filler Panel
14
Figure 6. Removing Lowest Floppy/CD-ROM/DVD Drives or Filler Panel
14
Install EMI Shield Onto LCP Carrier
15
Inserting LCP Carrier into Drive Bay of Server Chassis
15
Figure 7. Installing EMI Shield on LCP Carrier
15
Figure 8. Attaching Drive Rails to LCP Carrier
15
Route LCP Cable
16
Figure 9. Installing LCP Carrier
16
Figure 10. Routing the LCP Cable
16
Connect LCP Cable to LCP Header of Server Board
17
Figure 11. Attaching LCP Cable to Header on Intel® Server Board SE7520AF2
17
Replace Bezel Assembly
18
Figure 12. Attaching LCP Cable to Header on Intel® Server Board SE7520BD2
18
Replace Access Cover
19
Figure 13. Installing Inner Bezel Door
19
Figure 14. Replacing Access Cover
19
Installation Instructions for Intel® Entry Server Chassis SC5275-E
20
Remove Access Cover
20
Figure 15. Removing Access Cover
20
Remove Bezel
21
Remove Lowest CD-ROM/DVD Drive Filler Panel
21
Figure 16. Removing Bezel
21
Figure 17. Removing Lowest Floppy/CD-ROM/DVD Drives or Filler Panel
21
Install EMI Shield Onto LCP Carrier
22
Inserting LCP Carrier into Drive Bay of Server Chassis
22
Figure 18. Installing EMI Shield on LCP Carrier
22
Figure 19. Installing Drive Rails to LCP Carrier
22
Figure 20. Inserting LCP Carrier into Drive Bay
23
Figure 21. Routing LCP Cable in Intel® Entry Server Chassis SC5275-E
23
Connect LCP Cable to LCP Header on Server Board
24
Figure 22. Attaching LCP Cable to Header on Intel® Server Board SE7520AF2
24
Replace Bezel
25
Figure 23. Attaching LCP Cable to Header on Intel® Server Board SE7520BD2
25
Replace Access Cover
26
Figure 24. Installing Bezel
26
Figure 25. Replacing Access Cover
26
Installation Instructions for Intel® Entry Server Chassis SC5299-E
27
Remove Access Cover
27
Remove Bezel
27
Figure 26. Removing Access Cover
27
Remove Lowest CD-ROM/DVD Drive Filler Panel
28
Figure 27. Removing Bezel
28
Figure 28. Removing Lowest Floppy/CD-ROM/DVD Drives or Filler Panel
28
Install EMI Shield Onto LCP Carrier
29
Figure 29. Installing EMI Shield on LCP Carrier
29
Inserting LCP Carrier into Drive Bay of Server Chassis
30
Route LCP Cable
30
Figure 30. Inserting LCP Carrier into Drive Bay
30
Figure 31. Routing LCP Cable
30
Connect LCP Cable to LCP Header on Server Board
31
Figure 32. Attaching LCP Cable to Header on Intel® Server Board S5000VSA
31
Figure 33. Attaching LCP Cable to Header on Intel® Server Board S5000PSL or Intel® Server Board XVN
31
Figure 34. Installing Bezel
32
Figure 35. Replacing Access Cover
33
Advertisement
Advertisement
Related Products
Intel SC5275-E UP
Intel SC5275-E DP
Intel SC5275-E WS
Intel SC5299BRPNA
Intel SC5299DPNA
Intel SC5299WS
Intel SC5299BRP
Intel SC5299UP - Server Chassis Tower
Intel SC5299-E DP
Intel SC5295-E
Intel Categories
Motherboard
Computer Hardware
Server
Desktop
Server Board
More Intel Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL