Toshiba 2460 Service Handbook page 52

Digital plain paper copier
Table of Contents

Advertisement

1.10 Installation of Carriage Drive Wire
When the carriage drive wire is replaced, attach the new wire as shown:
Tension spring
Pulley
1.10.1 Wire tension adjustment
(1) For this model, it is unnecessary to adjust the carriage drive wire tension.
1.10.2 Adjustment of carriage 1 and carriage 2
(1) Remove the indicator unit.
(2) Loosen the 3 screws fixing carriage-1 (2
screws, front, rear, 1 screw each) and -2 (1
screw in front) to the wire.
(3) While pressing carriage-2 against the exit side
frame (both A & B), tighten the carriage-2 fix-
ing screws (front side).
(4) Also while pressing carriages 1 and 2 against
the exit side frame (C & D), tighten the car-
riage-1 fixing screws.
September 1997 © TOSHIBA CORP.
Scanning motor
Belt
Rear side view
1 - 49
Carriage drive wire
Carriage 1
Carriage 2
Wire winding pulley
Pulley
Exit side frame
Carriage 1
Exit side frame
D
Carriage 2
B
Exit side frame
Pulley
Exit side frame
C
A
2460 ADJUSTMENT

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents