Electrical Requirements; Boiler Controls - FULTON FB-L 012 Installation Operation And Care

Fulton electric boilers (steam models)
Table of Contents

Advertisement

Installation
Electrical Power Requirements (In Amps)
Model FB-L
012
208V 3 Phase
34
230V 1 Phase
52
230V 3 Phase
29
460V 3Phase
15
575V 3 Phase
13

Electrical Requirements

1. Connect wiring as shown in the specific
wiring diagram which is furnished inside
the cover of the electrical control box. Be
sure to install a separate fused
disconnect for the boiler. All wiring must
conform to NEC Code.
WARNING
Prior to powering up the boiler, all electrical
contacts require re-torquing to the
individual compenents manufacturers
recommendations.
2. A correctly sized fused disconnect switch
should be fitted as close to the boiler as
possible and connections made to the
boiler control panel in compliance with
NFPA
(National
Fire
Association), NEC Code, and local
codes. The appropriate number of
terminals are provided inside the control
panel box to take these connections, but
the panel box must be drilled to accept
14
Electric IOM
015
018 024 030 036
42
50
67
84
100
65
78
--
--
--
36
43
58
73
87
18
21
29
36
44
16
18
24
30
36
the type of conduit used.

Boiler Controls

Fulton packaged electric steam boilers are
equipped with both a steam pressure
control and a high limit pressure control
mounted on the outside or inside of the
electrical panel box.
1. The steam pressure control should be
adjusted to suit the boiler application.
The control has two scales (main and
differential) which can be adjusted by
means of screws on top of the control.
The main scale setting should be
adjusted to the desired operating steam
pressure.
Protection
Do not adjust to exceed the pressure
rating on the boiler.
2. A high limit pressure control is located
next to the operating steam pressure
050
075
100
150
200
139
208
278
416
556
--
--
--
--
--
120
180
241
361
482
60
90
120
180
241
50
76
101
150
201
CAUTION
300 500 750
1000
832
--
--
--
--
--
--
--
724
--
--
--
363 607 906
1204
301 502 756
1004
control and should be set 5 to 10 pounds
higher than the operating steam
pressure control. This control serves as
a secondary high pressure cut-off if for
some reason the main operating steam
pressure
control
should
inoperative.
Low Water Control
Relays
1. Boilers from 1.2 to 3.6 HP are e quipped
with one low water cut off relay in the
panel
box
connected
independent probes in the top of the
boiler and one water level control relay
in the panel box operating two probes in
the top of the boiler.
2. Boilers from 5 - 20 HP contain two low
water cut off relays in the panel box
connected to two independent probes in
the top of the boiler.
3. Boilers from 30 - 100 HP have an
external water column on the right hand
side of the boiler. There are two low
water cut off control relays in the panel
box. One connects to a probe in the top
of the boiler and the other connects to a
probe in the top of the water bottle.