FULTON FB-L 012 Installation Operation And Care page 14

Fulton electric boilers (steam models)
Table of Contents

Advertisement

Installation
Component Locations of the Fulton 12 to 1000 kW
(1.2 to 100BHP) Steam Boilers
1. Pressure Vessel Is Built to ASME Code
5 Year Warranty
2. Electrical Control Panel Box
3. Electric Heating Elements
4. Low Water Cut Off Probe
5. Second (auxiliary) Low Water Cut Off
Probe
6. Pump "On" Probe
7. Pump "Off" Probe
8. Sight Glass Assembly
9. Operating pressure control
10. High Limit Pressure Control w/ manual
reset
11. Steam Outlet
12. Safety Valve
13. Steam Guage Assembly
14. Steam Pressure Guage
15. High Temperature Insulation Surrounds
The Pressure Vessel
16. Large (3" x 4") Easy Access Handholes
17. Feedwater Shut Off Valve
18. Blowdown Valve
19. Water Bottle Assembly for 300 to 1000
kW Only
NOTE:
All Fulton Electric Steam Boilers have a
second (auxiliary) low water cut-off
probe
12 to 36 kW (1.2 to 3.6 BHP)
Element(s) are horizontally mounted at the
bottom of the pressure vessel. All probes
are located in the top of the boiler.
11
10
Electric IOM
50 to 200 kW (5 to 20 BHP)
Elements are vertically mounted. All probes
are located in the top of the boiler.
12
13
15
16
17
18
3
14
1 1
3
4
5
10
9
6
7
8
2
1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents