FULTON FB-L 012 Installation Operation And Care page 30

Fulton electric boilers (steam models)
Table of Contents

Advertisement

Maintenance
2. Cleaning Probes - Clean probe on top
of boiler shell and probes in water
column (30 - 100 BHP). Make sure
there is no pressure on boiler during the
removal of the probes. Remove one
probe, clean with very fine emery cloth
and replace it before removing another
to assure no probe mix ups that would
change the control functions. For
replacement purposes, installed probe
lengths are indicated in the chart below.
For a universally adaptable plug and
probe which can be cut to length in the
field to fit all boilers, order Part No. 2-20-
017.
1.2 to 3.6 HP
5 - 20 HP
A = 9-1/2"
A =11-1/2"
B = 10-1/2"
B = 13"
C = 11-1/2"
C = 15"
D = 11-1/2"
D = 15"
3. Drain the condensate tank and clean by
flushing with hose. Check float valve
operation.
4. Make sure pump is functioning.
5. Clean boiler out if necessary.
Installation Check Points: cleaning the
pressure vessel.
Recommended Annual
Maintenance
1. Repeat six month maintenance.
2. Check elements for correct amp draw.
3. Provide annual inspection by qualified
ASME Boiler Inspector (if applicable in
your state).
4. Re-torque all electrical connections in the
control panel box to the manufactueres
recommended specifications.
26
Electric IOM
30 - 100 HP
A = 7-1/4"
B = 9-1/4"
C = 11-1/4"
D = 16"
See
A
B
C
D