Gas Valve With Pilot Gas Line; Electrical Requirements; Steam Pressure Gauge - FULTON J Series Installation, Operation And Maintenance Manual

Gas fired steam boiler (including optional fully modulating burner)
Table of Contents

Advertisement

Fulton Ltd
2.10.1

GAS VALVE WITH PILOT GAS LINE

Models 40J - 60J
The main gas valve is fitted with a bypass system (internal or external depending on the model)
the bypass allows pilot pressure to be maintained whilst the flame is verified.
2.11

ELECTRICAL REQUIREMENTS

An individual wiring diagram for the boiler is located on the inside cover of the control box.
When referring to the electrical specification of the boiler, the reference number located on the
rear inside wall of the control box and the wiring diagram number should be quoted.
The audible alarms provided are mounted on the side of the control panel, if not audible they
should be repositioned where they can be heard by a person competent to take the appropriate
action should the alarm be activated.
Unless otherwise specified, the alarms supplied will be mains voltage models. Unless otherwise
specified all models are supplied with burner motors and feedwater pump motors arranged for
operation on a three phase supply.
The power ratings and requirements are given in Appendix A - TI-117-J Series Dimensions &
Specification.
2.12

STEAM PRESSURE GAUGE

The steam pressure gauge assembly should be assembled in accordance with Figure. 8 using a
suitable sealant on all joints.
The gauge should be facing front towards the electrical control box and/or the operator of the
boiler.
Screw the assembly into the top of the boiler and connect the copper tube from the pressure
controller located on the side of the control box to the nipple provided on the assembly.
JGASUK-IOMM-2015-2
Steam Pressure Gauge
Plugged
Steam Cock
Test Point
Syphon
Figure. 8 - Steam Pressure Gauge
INSTALLATION - 2
Page 9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents