Appendix 4: Installation Of Secondary Air Tubes And Baffle - Osburn 2200 Installation And Operation Manual

Hide thumbs Also See for 2200:
Table of Contents

Advertisement

  2200 Installation and Operation Manual 
APPENDIX 4: INSTALLATION OF SECONDARY AIR TUBES AND BAFFLE 
 
BAFFLE INSTALLATION 
1. Stack the baffle boards (A) on top of the c‐cast boards (B) as shown below. 
2. Put them on the horizontal air duct (C). Afterwards, push them towards the bottom and sides 
so  that  they  rest  on  the  back  of  the  firebox  (D)  and  on  the  side  air  ducts.  Install  the  baffle 
support/extension (H) ensuring that it fits between the front risers and hold it in place. Install 
the front secondary air tube ensuring air holes face forward. Install the cotter pins as indicated 
in the secondary air tubes installation procedure. Installing the front secondary air tube (E) will 
stabilize baffle assembly during the next step. 
46  _ _____________________________________________________________________________   
 
 
 

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ob02211

Table of Contents