Download Print this page

Phono Solar PowerHub 1800 Installation Manual page 25

Solar generator

Advertisement

Planning Overview
Important:
system. To use it as a stand-alone power source, it is not required to do any
special installation procedures.
However, if your installation involves renewable energy (solar
generators) or requires hardwiring for any reason, if you do not have adequate
knowledge of national and local building and electrical codes, do not attempt to
install this unit in a permanent installation. Consult your local renewable energy
dealer or qualified electrician for assistance.
1. Plan your installation carefully
2.
3. Know your limits.
4. Extract the
5. Review all instructions and materials provided with all the
6. Review all material provided with the batteries.
7. Review any material related to the installation of the renewable
8. Collect all necessary tools and materials for the installation.
9. Prepare the location for the installation and position the components.
Planning
This unit is intended as an entry-level inverter/charger backup
hardwired.
If hardwired, are there any special permits required.
Know the limits of the loads to be attached to the system.
Know the limits of the input and output to the inverter and the
batteries.
Know the electrical and building code requirements for the
desired location.
Analyze the location for the PowerHub for access and adequate
structural support.
Measure the distances for the cabling and wiring.
parts to ensure there is nothing missing.
equipment.
energy components.
etermine if the installation will be softwired
PowerHub from
24
or wind
packaging material and

Advertisement

loading