Hardwired Permanent Applications
Utility Backup Applications
Important:
"code-compliant" to the national and local building and electrical codes.
Installers should have adequate knowledge of national and local code to ensure
the installation passes inspection by the local electric authority.
Example only.
Actual installation may vary.
Important:
The combination of loads
cannot exceed 1440 W. Run-times will depend
on the amp-hour rating of the batteries.
Hardwired Utility Applications
Introduction
Installations of this kind must be certified/approved as
AC Distribution Panel
(Sub-Panel)
120 Vac
Outlets
19
AC IN
AC OUT
Main AC
Panel