Studer Vista 5 M2 Operating Instructions Manual page 450

Digital mixing system, sw v4.5
Hide thumbs Also See for Vista 5 M2:
Table of Contents

Advertisement

Vista 5 Digital Mixing System
Test the Installation:
7-6 ConfigTool
• Temp Files Path, and
• Config Path,
for which the appropriate paths must be entered manually; they must be fol-
lowed by a backslash (\) sign.
After making the appropriate entries please click "OK" to finish the prepa-
rations and to store the edited "
learn more about the use of the .ini file, please refer to
nance.
Now that you have installed all files and set the basic options, you can
proceed to test the whole installation, by generating an empty configura-
tion. This empty configuration is loaded per default after starting the appli-
cation.
Select the menu item "Generate" and then "All". This will start the process
of generating the DSP and control software that is needed to run a new
Session Configuration on your console. Various messages will be dis-
played, and after a while, a message similar to the following one should
appear:
After the message "Build All finished successfully !!" appears, click on
"OK" to finish the successful installation and test procedure.
SW V3.6
D950CfgTool.ini
" file automatically. To
chapter
Date printed: 20.06.2007
7.5, Mainte-

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents