Baxi Solo 2 60 RS Installation And Servicing Instructions page 32

Wall mounted room sealed gas fired central heating boilers
Table of Contents

Advertisement

Annual Servicing - Page 32
Cleaning the Combustion Box
Slide baffle forward (30, 40 and 50 models only).
Side insulation panels and rear insulation panel should be
removed to avoid brush damage.
To remove side panel, remove one screw per panel.
Slide panel down and away from location.
Rear insulation panel can now be removed.
The heat exchanger can now be easily cleaned thoroughly.
Remove any obstructions from flue outlet and air inlet.
Remove dirt and debris from bottom of combustion box.
Reassemble all components in reverse order. Check burner
setting pressure and gas rate. Recommission the boiler
before use, checking for gas soundness and ensuring all
controls are working correctly.
Complete the relevant section of the "Benchmark"
Installation, Commissioning and Service Record Log Book
and hand it back to the user.
32

Advertisement

Table of Contents
loading

This manual is also suitable for:

Solo 2 50 rsSolo 2 40 rsSolo 2 30 rs

Table of Contents