Baxi Solo 2 60 RS Installation And Servicing Instructions page 20

Wall mounted room sealed gas fired central heating boilers
Table of Contents

Advertisement

Installation - Page 20
Fitting the Boiler
When the boiler is to be used on a system with gravity
D.H.W. it is necessary to disconnect the overheat thermostat
by removing the wire with the black sleeve and attaching it to
the wire with the red sleeve as shown.
The overheat thermostat is now by-passed and will allow the
appliance to perform satisfactorily on gravity circulation.
NOTE: Even though the overheat thermostat is not
operational, it must not be removed from the pocket in the
heat exchanger except during servicing.
Lift boiler and engage centrally the back bottom edge into
the hook bracket on the mounting plate.
Rotate the boiler back to the mounting plate to engage two
studs and spring latch.
Fit the two wing nuts. Tighten to compress rear flue seal.
20

Advertisement

Table of Contents
loading

This manual is also suitable for:

Solo 2 50 rsSolo 2 40 rsSolo 2 30 rs

Table of Contents