Baxi MainEco Heat 15 Installation And Service Manual

Gas fired wall mounted powered flue condensing boiler
Hide thumbs Also See for MainEco Heat 15:
Table of Contents

Advertisement

United Kingdom
en
Installation and Service Manual
Gas Fired Wall Mounted Powered Flue Condensing Boiler
M M ainEco Heat
15 - 18 - 24
These instructions include the Benchmark Commissioning Checklist
and should be left with the user for safe keeping.
They must be read in conjunction with the Flue Installation Guide.

Advertisement

Table of Contents
loading

Summary of Contents for Baxi MainEco Heat 15

  • Page 1 United Kingdom Installation and Service Manual Gas Fired Wall Mounted Powered Flue Condensing Boiler M M ainEco Heat 15 - 18 - 24 These instructions include the Benchmark Commissioning Checklist and should be left with the user for safe keeping. They must be read in conjunction with the Flue Installation Guide.
  • Page 2 Introduction Model Range Building Regulations and the Benchmark Commissioning Checklist Baxi MainEco Heat 15 G.C.N 41-470-15 Building Regulations (England & Wales) require notification of the Baxi MainEco Heat 18 installation of a heating appliance to the relevant Local Authority G.C.N 41-470-16 Building Control Department.
  • Page 3: Installer Notification Guidelines

    Installer Notification Guidelines Installer Notification Guidelines Choose Building Regulations Notification Route Competent Person's Building Control Self Certification Scheme Install and Commission this Contact your relevant Local appliance to manufacturer's Authority Building Control instructions (LABC) who will arrange an inspection or contact a government approved inspector Complete the...
  • Page 4: Table Of Contents

    Contents Contents Introduction General Additional Documentation Symbols Used Abbreviations Extent of Liabilities 1.5.1 Manufacturer’s Liability 1.5.2 Installer’s Liability Homologations 1.6.1 Certifications 1.6.2 Directives 1.6.3 Standards Safety General Safety Instructions Recommendations Specific Safety Instructions 2.3.1 Handling Technical Specifications Technical Data Dimensions and Connections Electrical Diagram Description of the Product General Description...
  • Page 5 Contents 5.3.9 Flue/Chimney Trim 5.3.10 Terminal Guard 5.3.11 Flue/Chimney Deflector 5.3.12 Flue/Chimney Accessories Unpacking & Initial Preparation 5.4.1 Unpacking 5.4.2 Initial Preparation 5.4.3 Making the Water Connection 5.4.4 Filling the Condensate Trap 5.4.5 Connecting the Condensate Drain 5.4.6 Connecting the Gas Supply Installation Air Supply / Flue Gas Connections 6.1.1...
  • Page 6 Contents Maintenance 10.1 General 10.2 Standard Inspection & Maintenance Operation 10.3 Specific Maintenance Operation 10.3.1 Spark Ignition Electrode 10.3.2 Automatic Air Vent 10.3.3 Condensate Trap 10.3.4 Removal of Ducts 10.3.5 Pressure Switch (21 & 24 only) 10.3.6 Flow Temperature Sensor 10.3.7 Overheat Sensor 10.3.8...
  • Page 7: Introduction

    Introduction Introduction General WARNING Installation, repair and maintenance must only be carried out only by a competent person. This document is intended for use by competent persons, All Gas Safe registered engineers carry an ID card with their licence number and a photograph. You can check your engineer is registered by telephoning 0800 408 5500 or online at www.gassaferegister.co.uk This appliance must be installed in accordance with the...
  • Page 8: Additional Documentation

    Introduction Additional Documentation These Installation & Service Instructions must be read in conjunction with the Flue Accessories & Fitting Guide supplied in the Literature Pack. Various timers, external controls, flue accessories, etc. are available as optional extras. Full details are contained in the relevant sales literature.
  • Page 9: Extent Of Liabilities

    Introduction Extent of Liabilities 1.5.1 Manufacturer's Liability Our products are manufactured in compliance with the requirements of the various european applicable Directives. They are therefore delivered with marking and all relevant documentation. In the interest of customers, we are continuously endeavouring to make improvements in product quality.
  • Page 10: Installer's Liability

    Homologations 1.6.1 Certifications EC - Declaration of Conformity Baxi Heating Uk Limited being the manufacturer / distributor within the European Economic Area of the following Baxi MainEco Heat declare that the above is in conformity with the provisions of the...
  • Page 11: Standards

    Introduction 1.6.3 Standards Codes of Practice - refer to the most recent version In GB the following Codes of Practice apply: Standard Scope BS 6891 Gas Installation. BS 5546 Installation of hot water supplies for domestic purposes. BS EN 12828 Heating systems in buildings.
  • Page 12: Safety

    Safety Safety General Safety Instructions DANGER If you smell gas: Turn off the gas supply at the meter Open windows and doors in the hazardous area Do not operate light switches Do not operate any electrical equipment Do not use a telephone in the hazardous area Extinguish any naked flame and do not smoke Warn any other occupants and vacate the premises...
  • Page 13: Specific Safety Instructions

    Safety Specific Safety Instructions 2.3.1 Handling General • The following advice should be adhered to, from when first handling the boiler to the final stages of installation, and also during maintenance. • Most injuries as a result of inappropriate handling and lifting are to the back, but all other parts of the body are vulnerable, particularly shoulders, arms and hands.
  • Page 14: Technical Specifications

    Technical Specification Technical Specifications Technical Data Nox Class Appliance Type Horizontal Flue Terminal Diameter 100mm Electrical Supply 230V~ 50Hz Appliance Category CAT I Dimensions Projection 125mm (Appliance must be connected to an Heat Input (Gross) earthed supply) Connections 15 model 18.32 8.59 Gas Supply...
  • Page 15: Dimensions And Connections

    Technical Specifications Dimensions and Connections For clearances see DIMENSIONS Section 5.3.6 At Least A 625mm 1.5° B 270mm C 370mm D 116mm Ø Min. E 165mm F 155mm G 110mm H 550mm 360° Orientation NOTE: There must be no part of the air duct (white tube) visible outside the property after installation.
  • Page 16: Electrical Diagram

    Technical Specifications Electrical Diagram Technical Data (cont) Electrode Gas Valve Mains Safety Thermostat User Interaction Controller Electrical Test Point Not used Return Sensor Flow Sensor Parameter Unit Pressure Switch (where fitted) Loop Connector (where no pressure switch fitted) Key To Wiring Colours - Blue - Red - Brown...
  • Page 17: Description Of The Product

    Description of the Product Description of the Product General Description 1. The Baxi MainEco Heat Range are gas fired wall mounted powered flue condensing boilers. 2. The maximum output of the boiler is :- 15 model - 16 kW 18 model -...
  • Page 18: Operating Principle

    Technical Specifications Operating Principle 1. Switched Live On: When the boiler switched live turns on the boiler, a 20 second check cycle takes place. If the flow temperature is less than the boiler set-point temperature the Mains On. (CH or DHW demand) ignition cycle will start.
  • Page 19: Main Components

    Description of the Product Main Components Heat Exchanger Combustion Control Unit Condensate Trap Exhaust Tube Inlet Silencer User Interaction Controller Gas Cock Air Pressure Switch (21 & 24 model only) System Drain Cock Air Vent 7215845 - 01 (08/14) MainEco Heat...
  • Page 20: Control Panel Description

    Description of the Product Control Panel Description 4.4.1 User Interaction Controller (Control Panel) (Fig. 2) Key to symbols Heating Water Temperature Sweep Key and Status Signals Reset button and On/Off Signal 1. The User Interaction Controller has 2 illuminating push buttons which provide information about the operating condition of the boiler.
  • Page 21: Standard Delivery

    Description of the Product Standard Delivery 1. The pack contains: Boiler Wall Fixing Bracket Copper Tail (Gas Connection) and Fibre Washer Power Lead Literature pack • Installation & Servicing Manual (including ‘benchmark’) • User Guide • Flue Accessories & Fitting Guide •...
  • Page 22: Before Installation

    Before Installation Before Installation Installation Regulations WARNING Installation, repair and maintenance must only be carried out by a competent person. This document is intended for use by competent persons. Installation must be carried out in accordance with the prevailing regulations, the codes of practice and the recommendations in these instructions.
  • Page 23: Electrical Supply

    Description of the Product 5.2.2 Electrical Supply 1. External wiring must be correctly earthed, polarised and in accordance with relevant regulations/rules. In GB this is the current I.E.E. Wiring Regulations. In IE reference should be made to the current edition of ETCI rules. 2.
  • Page 24: System Details - General

    Before Installation 5.2.7 System Details - General Water Circulating Systems 1. The appliance is suitable for use with open vent fully pumped systems and sealed systems . The following conditions should be observed on all systems: • The static head must not exceed 25m of water. •...
  • Page 25: Sealed Systems Details

    BS 4814 must be fitted to the system by expansion vessel volume for sealed means of a connection close to the inlet side of the circulating systems using Baxi Boilers pump in accordance with the manufacturers instructions, the connecting pipe being unrestricted and not less than 15mm...
  • Page 26: Choice Of The Location

    Before Installation Choice of the Location 5.3.1 Location of the Appliance Due to the high efficiency of the boiler a plume of water vapour will be discharged from the flue. This should be taken into account when siting the flue terminal. 1.
  • Page 27: Condensate Drain

    Before Installation 5.3.5 Condensate Drain Examples are shown of the following methods of termination:- i) to an internal soil & vent pipe FAILURE TO INSTALL THE CONDENSATE ii) via an internal discharge branch (e.g. sink waste) DISCHARGE PIPEWORK CORRECTLY WILL AFFECT downstream of the trap THE RELIABLE OPERATION OF THE BOILER.
  • Page 28 Before Installation 9. If the boiler is fitted in an unheated location the entire condensate discharge pipe should be treated as an external run iii) Termination to a drain Boiler and sized and insulated accordingly. or gully 10. In all cases discharge pipe must be installed to aid disposal of the condensate.
  • Page 29: Clearances - Access In Service

    Before Installation 5.3.6 Clearances - Access in Service 1. A flat vertical area is required for the installation of the boiler. 2. These dimensions include the necessary clearances around the boiler for case removal, spanner access and air movement (Figs. 9 & 10). Additional clearances may be required for the passage of pipes around local obstructions such as joists running parallel to the front face of the boiler.
  • Page 30: Flue/Chimney Location

    Before Installation 5.3.7 Flue/Chimney Location 1. The following guidelines indicate the general requirements for siting balanced flue terminals. For GB recommendations are given in BS 5440 Pt 1. For IE recommendations are given in the current edition of I.S. 813 “Domestic Gas Installations”. Under car ports we recommend the use of the plume displacement kit.
  • Page 31 Before Installation Due to the nature of the boiler a plume of water vapour will be discharged from the flue. This should be taken into account when siting the flue terminal. 2. If the terminal discharges onto a pathway or passageway, check that combustion products will not cause a nuisance and that the terminal will not obstruct the passageway.
  • Page 32: Horizontal Flue/Chimney Systems

    Before Installation 5.3.8 Horizontal Flue/Chimney Systems 1. The standard telescopic flue is suitable only for horizontal termination applications. It allows for lengths between 315mm and 500mm from elbow to terminal without the need for cutting (ii) (Fig. 14). Extensions of 250mm, 500mm & 1m are available. 2.
  • Page 33: Flue/Chimney Trim

    Before Installation 5.3.9 Flue/Chimney Trim 1. The flexible flue trims supplied can be fitted on the outer and inner faces of the wall of installation (Fig. 14). Terminal 5.3.10 Terminal Guard Guard 1. When codes of practice dictate the use of terminal guards (Fig.
  • Page 34: Unpacking & Initial Preparation

    Before Installation Unpacking & Initial Preparation 5.4.1 Unpacking 1. Follow the procedure on the carton to unpack the boiler. See Section 2.3.1 Handling before lifting the boiler. 5.4.2 Initial Preparation 1. After considering the site requirements, position the fixing template on the wall ensuring it is level both horizontally and vertically (Fig.
  • Page 35: Making The Water Connection

    Before Installation 5.4.3 Making the Water Connections (Fig. 22) 1. There are two water connections at the top of the boiler. The left connection is the return pipe (blue) and the flow the right hand one (red). Remove the sealing caps from the boiler connections.
  • Page 36: Installation

    Installation Installation Air Supply / Flue Gas Connections 6.1.1 Connecting the Top Flue HORIZONTAL TELESCOPIC FLUE 1. There are two telescopic sections, the Terminal Assembly and the Connection Assembly, a roll of sealing tape and two self tapping screws. A 93° elbow is also supplied. Terminal Assembly 2.
  • Page 37 Installation Spring Latch 10. Lift the boiler and locate the slots in the wall bracket over the horizontal tongues on the wall bracket. As the boiler is pushed back the wall bracket spring latch will positively engage over the wall mounted bracket (Figs. AA, BB & CC). Horizontal Tongue 11.
  • Page 38: Electrical Connections

    Installation Electrical Connections 6.2.1 Electrical Connections of the Appliance 1. See Section 5.2.2. for details of the electrical supply. 1.3 metres of 3 core cable are supplied connected to the boiler. 2. The cable live must be connected to the control system switched live.
  • Page 39: Filling The System

    Installation Filling the System See Section 5.2.6. for details of treating the system, Section 5.2.7. for open vent system details, Section 5.2.9. for sealed system details and Section 5.4.4. for filling the condensate trap. Completing the Installation 6.4.1 Completion 1. Before turning on the electrical and gas supply to commission the boiler, check that all the installation requirements for the chosen heating system and flue options have been satisfied.
  • Page 40: Commissioning

    Commissioning Commissioning General 1. Reference should be made to BS:EN 12828 & 14336 when commissioning the boiler. 2. At the time of commissioning, complete all relevant sections of the Benchmark Checklist at the rear of this publications. 3. Turn the gas supply on and purge according to in GB BS 6891 and in IE I.S.
  • Page 41: Gas Settings

    Commissioning Gas Settings 7.4.1 ‘Chimney Sweep’ Mode (CSM) Flue Sampling Point 1. The current operating condition of the boiler is shown by the Plug button on the User Interaction Controller. The button can flash in a range of colours and at different frequencies.
  • Page 42: Chimney Sweep' Mode - Combustion Check

    Commissioning 7.4.2 ‘Chimney Sweep’ Mode - Combustion Check Set Boiler to Maximum Rate 1. This procedure is mandatory in GB from April 2014. It is Allow the combustion to recommended to perform the procedure before that date. stabilise. Do not insert probe to avoid ‘flooding’...
  • Page 43: Configuring The System

    Commissioning Configuring the System 7.5.1 Check the Operational (Working) Gas Inlet Pressure 1. Ensure that all controls are calling for heat and maximum load is applied to the system. 2. With the boiler operating in the maximum rate condition check that the operational (working) gas pressure at the inlet gas pressure test point is in accordance with B.S.
  • Page 44: Final Instructions

    Commissioning Final Instructions 1. Carefully read and complete all sections of the Benchmark Commissioning Checklist at the rear of this publication that are relevant to the boiler and installation. These details will be required in the event of any warranty work. 2.
  • Page 45: Operation

    Operation Operation General 1. It is the responsibility of the installer to instruct the user in the day to day operation of the boiler and controls and to hand over the completed Benchmark Checklist at the back of this manual. 2.
  • Page 46: Use Of The Control Panel

    Operation Use of the Control Panel See Section 4.4 Control Panel Description Frost Protection 1. To prevent radiators and pipework from freezing in areas where there is a risk of frost (e.g. a garage or storage room), a frost thermostat should be connected to the control system. The following arrangement is recommended:- Utilise a room frost thermostat in conjunction with a pipe thermostat.
  • Page 47: Settings

    Settings Settings Parameters The operating parameters for this boiler are factory set. 7215845 - 01 (08/14) MainEco Heat...
  • Page 48: Maintenance

    Maintenance Maintenance 10.1 General 1. For reasons of safety and economy, it is recommended that the boiler is serviced annually. Servicing must be performed by a WARNING competent person in accordance with B.S. 7967-4. When changing components ensure that both the gas and electrical supplies to the boiler are isolated 2.
  • Page 49: Standard Inspection & Maintenance Operation

    Maintenance 10.2 Standard Inspection and Maintenance Operation WARNING Ensure that the boiler is cool. Ensure that both the gas and electrical supplies to the boiler are isolated. Electrical isolation can be checked at the electrical test point. CAUTION During inspection and maintenance operations, Fig.
  • Page 50: 10.3 Specific Maintenance Operation

    Maintenance 10.3 Specific Maintenance Operation WARNING When changing components ensure that both the gas and electrical supplies to the boiler are isolated Spark Ignition Earth Gasket before any work is started. When the component has Electrode Wire been changed recommission the boiler as described in Section 7.
  • Page 51: Removal Of Ducts

    Maintenance Removal of the fan air duct and flue outlet duct is necessary to enable the changing of the pressure switch, flow temperature sensor, return temperature sensor, overheat sensor and gas valve. Fan Air 10.3.4 Removal of Ducts (Fig. 42) Duct 1.
  • Page 52: Flow Temperature Sensor

    Maintenance Flow 10.3.6 Flow Temperature Sensor (Fig. 44) Temperature Sensor The sensor is fitted in a ‘dry’ pocket. Fig. 44 1. Disconnect the wiring from the flow temperature sensor. 2. Unscrew the sensor from the top of the heat exchanger. 3.
  • Page 53: Gas Valve

    Maintenance 10.3.10 Gas Valve (Figs. 47, 48 & 49) After replacing the valve the CO 2 must be checked and adjusted as detailed in Section 10.3.13 Setting the Gas Valve. Only change the valve if a suitable calibrated combustion analyser is available, operated by a competent person - see section 10.1.3.
  • Page 54: Control & Fan Assembly

    Maintenance 10.3.11 Control & Fan Assembly (Figs. 50, 51 & 52) Burner Manifold 1. Ensure that the gas supply to the boiler is isolated. Remove the ducts as described in Section 10.3.4 An ESD wrist strap should be used when replacing these components.
  • Page 55: Setting The Gas Valve (Co Check)

    Throttle Maintenance Adjustment Screw 10.3.13 Setting the Gas Valve (CO Check) The CO 2 must be only be checked and adjusted to set the valve if a suitable calibrated combustion analyser is available, operated by a competent person - see Section 10.1.3.
  • Page 56: Troubleshooting

    Troubleshooting Troubleshooting 11.1 Error Codes Operation status and error codes are displayed on the “chimney sweep” button (3) on the control panel. In normal operation this button is illuminated and goes off for a time once periodically. When normal operation is interrupted for some reason this button will turn off and flash on a number of times periodically.
  • Page 57: Lockout Condition

    Troubleshooting Lock-out conditions (Red flashes on “chimney sweep”) The following TABLE describes the conditions that may result in a lock-out condition and red flashing signal being displayed. To reset a lock-out condition press and hold the reset button until the fault indication flashes rapidly and goes out. NOTE: a lock-out condition can be re-set up to 5 times within one hour using the reset button.
  • Page 58: 12.1 Decommissioning Procedure

    Decommissioning Decommissioning 12.1 Decommissioning Procedure 1. Disconnect the gas & electric supplies and isolate them. 2. Drain the primary circuit and disconnect the filling device. 3 . Dismantle the chimney system and remove the boiler from the wall mounting frame. MainEco Heat 7215845 - 01 (08/14)
  • Page 59: Spare Parts

    Spare Parts Spare Parts 13.1 General 1. If, following the annual inspection or maintenance any part of the boiler is found to need replacing, use Baxi Spare Parts only. 13.2 Spare Parts List Description Manufacturer’s Part No. Parameter Unit 7216298...
  • Page 60: Notes

    Notes MainEco Heat 7215845 - 01 (08/14)
  • Page 61 Notes 7215845 - 01 (08/14) MainEco Heat...
  • Page 62: Benchmark Commissioning Checklist

    GAS BOILER SYSTEM COMMISSIONING CHECKLIST This Commissioning Checklist is to be completed in full by the competent person who commissioned the boiler as a means of demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference. Failure to install and commission according to the manufacturer’s instructions and complete this Benchmark Commissioning Checklist will invalidate the warranty.
  • Page 63: Service Record

    SERVICE RECORD It is recommended that your heating system is serviced regularly and that the appropriate Service Interval Record is completed. Service Provider Before completing the appropriate Service Record below, please ensure you have carried out the service as described in the manufacturer’s instructions. SERVICE 01 SERVICE 02 Date:...