Baxi Solo 2 60 RS Installation And Servicing Instructions page 31

Wall mounted room sealed gas fired central heating boilers
Table of Contents

Advertisement

Annual Servicing - Page 31
Cleaning the Burner/Injectors
Lightly brush any debris from top of burner blades and
ensure that ports are free of obstructions.
Remove the two nuts fixing the burner manifold to the burner
feed pipe.
Remove the two nuts fixing the burner manifold to the
combustion chamber door.
Remove the two screws fixing the burner brackets to the
combustion chamber door.
Remove burner assembly, (noting position of pilot shield) 'O'
ring and gasket.
Remove the two screws fixing the mounting bracket.
Remove the four screws to separate the manifold from the
blade assembly. Clean venturies.
Unscrew injectors, clean carefully and replace.
Check seal around the door and replace if necessary.
Reassemble burner to door and feed pipe, ensuring the pilot
shield is in the correct position.
31

Advertisement

Table of Contents
loading

This manual is also suitable for:

Solo 2 50 rsSolo 2 40 rsSolo 2 30 rs

Table of Contents