77 BLACK
73
75
76
54
49
8
44
29
FIGURE 29
STEP 29:
• SECURELY assemble two 4-1/2" PULLEYS (38) to the BOOM (8) using two BLACK RH CAPS (77), two RH CAPS (78), two
3/8 X 2-3/4" BOLTS (68), four 3/8" SAE WASHERS (75), four 3/8" RH WASHERS (76), four 3/8 X 1/2" FLANGE SPACERS
(54), two 2-7/8 X 2-1/4" CABLE CLIPS (49) and two 3/8" LOW HEIGHT LOCK NUTS (73) as shown in FIGURE 29.
• Slide one WEIGHT STACK PIN (33) over the STEM on the HEAD PLATE (29) as shown in FIGURE 29.
• Screw the threaded end of the LAT CABLE (44) all the way onto the end of the STEM on the HEAD PLATE (29) and tighten jam
nut securely. See FIGURE 29.
1/2
0
10
20
33
1
2
1/2
30
40
50
60
38
3
1/2
1/2
70
80
90
100
20
68 3/8 X 2-3/4" (70m)
78
4
5
1/2
1/2
110
120
130
6
140
150