Dual Installation - Sub-Zero ICBBI-36F Manual

Built-in design guide stainless flush inset installation
Table of Contents

Advertisement

Built-In Refrigeration

Dual Installation

STAINLESS FLUSH INSET APPLICATION
Installing two built-in models side by side in a stainless
fl ush inset application will require adjustments to the
dimensions of your fi nished rough opening. It will also
require a dual installation kit, avail able through your
FILLER STRIP REQUIRED
FILLER STRIP REQUIRED
authorized Sub-Zero dealer.
WITHOUT FILLER STRIP
* Dual installations without a fi ller strip can only be accom-
plished using two units with opposite hinges as shown
in illustration A below. The dual installations shown in
illustrations B and C require a fi ller strip. Illustration A
is the only application that will accommodate the dual
wide grille.
FILLER STRIP REQUIRED
FILLER STRIP REQUIRED
WITHOUT FILLER STRIP
Illus. A
Illus. B
FILLER STRIP REQUIRED
FILLER STRIP REQUIRED
FILLER STRIP REQUIRED
FILLER STRIP REQUIRED
FILLER STRIP REQUIRED
FILLER STRIP REQUIRED
Illus. C
FILLER STRIP REQUIRED
FILLER STRIP REQUIRED
11
subzero.com/specs

Advertisement

Table of Contents
loading

Table of Contents