The following procedures should be followed to test the CD85 for correct

operation:

1.
After unpacking, examine all external features to confirm damage-
free shipment. Report all defects and damage at once. Connect the
power cable to a grounded electrical outlet.
2.
Check dehumidification process as follows:
TO ENSURE CONTINUED FULL EFFICIENCY OF THE
DEHUMIDIFEIR, MAINTENANCE PROCEDURES SHOULD BE
A. Place unit on a level surface.
B. Start up unit by connection to mains supply and switching the on
off switch to the 'I' position.
C. Check that the compressor is running.
D. Leave the machine running for 15 minutes.
E. Observe the evaporator coils through the evaporator filter panel
i. If the air temperature is below 80° F, an even coating of
ii. If the air temperature is above 80° F, frost and/or droplets
F. After continuous running time of approximately 55 minutes, the
unit will enter "Hot Gas" defrost mode for 5 minutes and then
automatically return to normal operation.
If, after carrying out the above procedures, the unit does not appear to
function properly, refer to the Trouble Shooting section, which follows,
or contact the Factory Service Center.
ONCE THE UNIT HAS BEEN SWITCHED OFF, WAIT AT
LEAST FIVE MINUTES BEFORE RESTARTING.
After using the ECO85, turn it off for 5 minutes to allow the condensate on the
coils to drain into the pump reservoir, then turn it back on and press the
momentary purge switch for twenty to thirty seconds to evacuate the water
from the pump reservoir.
OPERATION
PERFORMED AS FOLLOWS:
frost should cover the entire evaporator coil
of
condensed
water
evaporator coil.
CAUTION:
Page 5 of 13
Drawing : - TPC376
Issue
: - 4
Date
: - 03/10/12
should
cover
the
entire

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents