Table of Contents

Advertisement

The following procedures should be followed to test the K100H for correct

operation:

1.
After unpacking, examine all external features to confirm damage-
free shipment. Report all defects and damage at once. Connect the
power cable to a grounded electrical outlet.
2.
Setting the Digital Humidistat
The Digital Humidistat is factory preset to give the optimum
level of control. Only adjustment of the desired set point is
required.
During normal operation, the display shows the current % Relative
Humidity within the space being conditioned.
The required humidity level can be set as follows:
desired Humidity level
control returns to displaying the current % Relative
Humidity
3.
Check dehumidification process as follows:
TO ENSURE CONTINUED FULL EFFICIENCY OF THE
DEHUMIDIFEIR, MAINTENANCE PROCEDURES SHOULD BE
A.
Place unit on a level surface.
B.
Start up unit by turning the ON/OFF switch to ON
C.
Check that the compressor is running.
D.
Leave the machine running for 15 minutes.
E. Observe the evaporator coils through the rear upper grill, to
confirm frost operation.
Pure n Natural Systems | purennatural.com | 1-800-237-9199
OPERATION
Press the "S" button once to access the set point
Press the ▲ or ▼ button to change the display to the
Press the "S" button again to save the set point – The
PERFORMED AS FOLLOWS:
Page 6 of 16
E B A C
K - 1 0 0 H
D E H U M I D I F I E R
Drawing : - TPC450
Issue
: - 1
Date
: - 18/01/16

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ebac k100eEbac k100h

Table of Contents