The following procedures should be followed to test the RM4500 for correct

operation:

1.
After unpacking, examine all external features to confirm
damage-free shipment. Report all defects and damage at once. Connect the
power cable to a grounded 13 Amp electrical outlet. Connect the drainage
outlet to a suitably sized hose and run the hose to a permanent drain.
2.
Setting the Digital Humidistat
The Digital Humidistat is factory preset to give the optimum
level of control. Only adjustment of the desired set point is
required.
During normal operation, the display shows the current % Relative
Humidity within the space being conditioned.
The required humidity level can be set as follows:
3.
Check dehumidification process as follows:
DO NOT REMOVE COVERS WHEN UNIT IS IN OPERATION
A.
Place unit on a level surface.
B.
Start up unit by switching to "I".
C.
Check that the compressor is running.
D.
Leave the machine running for 1 Hour.
E.
Operate the pump purge switch and ensure water is pumped
out of the condensate outlet tube located on the back of the
unit.
OPERATION
Press the "S" button once to access the set point
Press the ▲ or ▼ button to change the display to the
desired Humidity level
Press the "S" button again to save the set point – The
control returns to displaying the current % Relative
Humidity
CAUTION:
Page 4 of 12
Drawing : - TPC448
Issue
: - 3
Date
: - 24/11/16