Operation - EIP EBAC CS90 Owner's Manual

Industrial
Table of Contents

Advertisement

The following procedures should be followed to test the CS90E for correct

operation:

1.
After unpacking, examine all external features to confirm damage-
free shipment. Report all defects and damage at once. Connect the
power cable to a grounded 15 Amp electrical outlet.
2.
Setting the humidistat
3.
Check dehumidification process as follows:
TO ENSURE CONTINUED FULL EFFICIENCY OF THE
DEHUMIDIFEIR, MAINTENANCE PROCEDURES SHOULD BE
A.
Place unit on a level surface.
B.
Start up unit by turning the ON/OFF switch to ON
C.
Check that the compressor is running.
D.
Leave the machine running for 15 minutes.
E. Observe the evaporator coils through the rear upper grill, to
confirm frost operation.
i. If the air temperature is below 80° F, an even coating of
ii. If the air temperature is above 80° F, frost and/or droplets
F. After continuous running time of approximately 55 minutes, the
unit will enter "Hot Gas" defrost mode for 5 minutes and then
automatically return to normal operation.
If, after carrying out the above procedures, the unit does not appear to
function properly, refer to the Trouble Shooting section, which follows,
or contact the Factory Service Center.
ONCE THE UNIT HAS BEEN SWITCHED OFF, WAIT AT
LEAST FIVE MINUTES BEFORE RESTARTING.
E B A C C S - 9 0 - E
Pure n Natural Systems | purennatural.com | 1-800-237-9199
OPERATION
Turn fully clockwise
PERFORMED AS FOLLOWS:
frost should cover the entire evaporator coil
of
condensed
evaporator coil.
CAUTION:
Page 6 of 12
D E H U M I D I F I E R
Drawing : - TPC447
Issue
Date
water
should
cover
O W N E R ' S
M A N U A L
: - 2
: - 23/05/16
the
entire

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ebac cs90hEbac cs90e

Table of Contents