2.3 Installing the device
install the 5 stabilizing brick (supplied, see §1.2),
place on a stable, solid (concrete slab type), level and plane surface,
protect from risks of flooding due to condensation produced by the device during operation (see §2.4)
The heat pump can be fixed to the ground using the brackets at the base of the unit (attachments not
included). A diagram of drilling is available to the back of the packing box.
2.4 Hydraulic connections
Check the direction of the pipework connection (see § "Dimensions" in the appendix).
The connection shall comprise a Ø 50 PVC rigid pipe, from a by‐pass, on the swimming pool filtration circuit,
after the filter and before any water treatment unit .
check the tightening of the hydraulic connections, and for leaks,
Hydraulic circuit pressure
test
PFP
bar
6
8
11
3
13
15
H03620‐00.B5.EN – 2011/11
service
bar
1.5
Fixing holes
V1‐V2‐V3: by‐pass valves
V5‐V4: setting valves (optional)
* minimum distance
by‐pass
filter
water treatment unit
electrical protection boxes
Connections
= inlet
= outlet
Ø50
Mean water
Head loss
flowrate
test